The engine room was flooded with sea water, the M/E was severely rusted.
Due to the engine room water intrusion accident in 2020, the main engine was flooded and there was no ability to carry out emergency repairs at the time. After being left for two years, the internal parts of the main engine were severely rusted. The Bed Plate, A-Frame, Crankshaft, Connecting Rod, Piston Rod, Crosshead, Slider, Main bearing, Connecting rod, Crosshead bearing, thrust bearing, and other major components cannot be repaired and used.
Spare parts are involved in wide range, many sub-items, and large quantities.
Total 55 major items; 394 sub-items; 6002 items
The quantity and types of unconventional items are large, such as: BED PLATE, A FRAME, etc. The delivery time is 12-18 months which cannot meet the owner's requirement which is to set vessel operation within one year.
Rely on our own technical advantages to check drawings, confirm items specifications and delivery dates for regular projects, then quickly quote;
Rely on the advantages of long-term cooperation with Chinese MAN MAKER FACTORIES (DMD, CSE), we got the shortest delivery time for major parts such as BED PLATE, A-FRAME etc., under MAKER FACTORIES’support.
Go on board with the Maker factory engineer to measure the major parts dimensions to ensure correct supply. Specially for the accurate installations of Bed plate & Hull, A-frame & Cylinder Block.
Maintain close communication with the Maker Factory and regularly go for on-site inspection to ensure productions follow delivery schedule.
FIRST INSPECTION IN FACTORY
SECOND INSPECTION IN OWN WAREHOUSE
DELIVER TO DESTINATION
Go on board with the MAKER engineers to provide on-site technical guidance with professional technical documents for installation.
Due to the Project complexity, there were under-ordered items during installation. We arranged quick supply and items arrived within 4 days. For the parts that affects progress, our employee was required to fly to Oman with spare parts to avoid delay for installation.This action has saved USD20000 for onwer.
The M/E runs successfully and ship sets sail.